Commercial · Working at height

Celloglas · commercial cladding painting

Commercial Leicestershire Cladding + MEWP access · Leicestershire

Full industrial cladding re-paint at Celloglas — prepared, coated and finished at height with cherry-picker (MEWP) access so the whole elevation stays consistent.

What we did

Warehouse and factory cladding sits well above safe ladder height. On this Celloglas project we programmed a cherry picker (articulated boom / MEWP) so every bay of the vertical metal cladding could be reached safely — from the brick line to the eaves — with IPAF-qualified operatives and site controls in place.

The photos show the job in stages: weathered cladding before and during prep, panels progressing through the programme, and the site with our van once the fresh coating was on. Phasing kept the unit operational while we worked through the elevation section by section.

If your cladding, fascias or high elevations need painting, we survey free of charge, include powered access in the method where it is needed, and agree a fixed price before work starts.

On YouTube

See the work in action

View channel